Statement of Responsibility

As Secretary for Internal Affairs I am responsible, under the Public Finance Act 1989, for the preparation of the financial statements and the judgements made in the process of producing those statements.

The Department has a system of internal control and this has provided reasonable assurance as to the integrity and reliability of financial reporting.

In my opinion the financial information presented in the Statements and Notes to the Financial Statements fairly reflects the financial position and operations of the Department of Internal Affairs for the year ended 30 June 2010.

Brendan Boyle Chief Executive

Shirley Smith Chief Financial Officer

Date: 30 September 2010

Date: 30 September 2010

Audit Report

Audit Logo

To the readers of the Department of Internal Affairs financial statements and statement of service performance for the year ended 30 June 2010

The Auditor-General is the auditor of the Department of Internal Affairs (the Department). The Auditor-General has appointed me, Leon Pieterse, using the staff and resources of Audit New Zealand, to carry out the audit on her behalf. The audit covers the financial statements, the schedules of non-departmental activities and statement of service performance included in the annual report of the Department, for the year ended 30 June 2010.

Unqualified opinion

In our opinion:

The audit was completed on 30 September 2010, and is the date at which our opinion is expressed.

The basis of the opinion is explained below. In addition, we outline the responsibilities of the Chief Executive and the Auditor, and explain our independence.

Basis of opinion

We carried out the audit in accordance with the Auditor-General’s Auditing Standards, which incorporate the New Zealand Auditing Standards.

We planned and performed the audit to obtain all the information and explanations we considered necessary in order to obtain reasonable assurance that the financial statements and statement of service performance did not have material misstatements, whether caused by fraud or error.

Material misstatements are differences or omissions of amounts and disclosures that would affect a reader’s overall understanding of the financial statements and statement of service performance. If we had found material misstatements that were not corrected, we would have referred to them in our opinion.

The audit involved performing procedures to test the information presented in the financial statements and statement of service performance. We assessed the results of those procedures in forming our opinion.

Audit procedures generally include:

  • determining whether significant financial and management controls are working and can be relied on to produce complete and accurate data;
  • verifying samples of transactions and account balances;
  • performing analyses to identify anomalies in the reported data;
  • reviewing significant estimates and judgements made by the Chief Executive;
  • confirming year-end balances;
  • determining whether accounting policies are appropriate and consistently applied; and
  • determining whether all financial statement and statement of service performance disclosures are adequate.

We did not examine every transaction, nor do we guarantee complete accuracy of the financial statements and statement of service performance.

We evaluated the overall adequacy of the presentation of information in the financial statements and statement of service performance. We obtained all the information and explanations we required to support our opinion above.

Responsibilities of the Chief Executive and the Auditor

The Chief Executive is responsible for preparing the financial statements and statement of service performance in accordance with generally accepted accounting practice in New Zealand. The financial statements must fairly reflect the financial position of the Department as at 30 June 2010 and the results of its operations and cash flows for the year ended on that date.

The financial statements must also fairly reflect the expenses and capital expenditure incurred against each appropriation administered by the Department and each class of outputs included in each output expense appropriation for the year ended 30 June 2010. The financial statements must also fairly reflect the Department’s unappropriated expenses and capital expenditure for the year ended on that date.

In addition, the Chief Executive is responsible for preparing schedules of non-departmental activities, in accordance with the Treasury Instructions 2009 that must fairly reflect the assets, liabilities, revenues, expenses, contingencies, commitments and trust monies managed by the Department on behalf of the Crown for the year ended 30 June 2010.

The statement of service performance must fairly reflect, for each class of outputs, the Department’s standards of delivery performance achieved and revenue earned and expenses incurred, as compared with the forecast standards, revenue and expenses adopted at the start of the financial year.

The Chief Executive’s responsibilities arise from sections 45A and 45B of the Public Finance Act 1989.

We are responsible for expressing an independent opinion on the financial statements and statement of service performance and reporting that opinion to you. This responsibility arises from section 15 of the Public Audit Act 2001 and section 45D(2) of the Public Finance Act 1989.

Independence

When carrying out the audit we followed the independence requirements of the Auditor-General, which incorporate the independence requirements of the New Zealand Institute of Chartered Accountants.

Other than the audit, we have no relationship with or interests in the Department.

Leon Pieterse

Audit New Zealand

On behalf of the Auditor-General

Wellington, New Zealand

Matters relating to the electronic presentation of the audited financial statements

  • This audit report relates to the financial statements of the Department for the year ended 30 June 2010 included on the Department’s website. The Department’s Chief Executive is responsible for the maintenance and integrity of the Department’s website. We have not been engaged to report on the integrity of the Department’s website. We accept no responsibility for any changes that may have occurred to the financial statements since they were initially presented on the website.
  • The audit report refers only to the financial statements named above. It does not provide an opinion on any other information which may have been hyperlinked to/from these financial statements. If readers of this report are concerned with the inherent risks arising from electronic data communication they should refer to the published hard copy of the audited financial statements and related audit report dated 30 September 2010 to confirm the information included in the audited financial statements presented on this web site.
  • Legislation in New Zealand governing the preparation and dissemination of financial statements may differ from legislation in other jurisdictions.

Quick Guide to Outputs

  • Vote Community and Voluntary Sector
    • Community and Voluntary Sector Services*
    • Administration of Grants
    • Community Advisory Services
    • Policy Advice – Community
  • Vote Emergency Management
    • Emergency Management Services*
    • Management of National Emergency Readiness, Response and Recovery
    • Policy Advice – Emergency Management
    • Support Services, Information and Education
  • Vote Internal Affairs
    • Contestable Services
    • Government Technology Services
    • Identity Services
    • Policy and Advisory Services*
    • Information and Advisory Services
    • Policy Advice – Internal Affairs
    • Gambling and Censorship Regulatory Services
    • Services for Ethnic Affairs
    • Anti-Money Laundering and Countering Financing of Terrorism
  • Vote Local Government
    • Implementation of Auckland Governance Reforms
    • Services for Local Government*
    • Information Support and Regulatory Services – Local Government
    • Policy Advice – Local Government
  • Vote Ministerial Services
    • Support Services to Ministers
    • VIP Transport
    • Visits and Official Events Coordination
  • Vote Racing
    • Policy Advice – Racing

* These are multi-class output appropriations.

VOTE COMMUNITY AND VOLUNTARY SECTOR

The funding within Vote Community and Voluntary Sector contributes to helping communities to define and work towards their own vision, to assist in building a stronger society, promoting voluntary activity and participation in civil society. The Department is particularly responsible for the following outputs:

  • the administration of grants
  • community advisory services
  • policy advice – community.

The services provided within these outputs enable the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Contribution
Contributes to:

Administration of Grants

  • Providing advice that supports community development
  • Providing communities with access to resources through grant funding and services
  • Providing responsive policies and services to diverse communities

Strong, sustainable communities/
hapū/iwi

Community Advisory Services

Policy Advice – Community

VOTE COMMUNITY AND VOLUNTARY SECTOR

Administration of Grants

Description

This output covers:

  • providing information and assistance to prospective grant applicants
  • processing, assessing and monitoring grant applications
  • providing recommendations to Ministers on appointments to boards, committees and trusts
  • providing administration, training and support services to boards and grant distribution committees.

Grant services cover the following schemes:

  • Lottery grants
  • Community Organisation Grants Scheme
  • Crown funding schemes, trusts and fellowships.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Administration of Applications and Grants
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Lottery Grants

Percentage of respondents to a survey of Lottery grant applicants who rate their satisfaction with the quality of services provided at 3 or above on a scale of 1 to 5 is no less than:

90%

98%

96%

Achieved

Percentage of respondents to a survey of Lottery committee members who rate their satisfaction with the quality of services provided to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

100%

Achieved

Percentage of complete and eligible applications received before the advertised closing date that are presented to the next decision-making meeting is no less than:

95%

100%

100%

Achieved

Percentage of payments made to grant recipients within 20 working days of receipt of committee approval and completed client documentation is no less than:

95%

97.4%

98.6%

Achieved

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Community Organisation Grants Scheme

Percentage of respondents to a survey of Community Organisation Grants Scheme applicants who rate their satisfaction with the quality of services provided at 3 or above on a scale of 1 to 5 is no less than:

90%

98%

99%

Achieved

Percentage of respondents to a survey of Community Organisation Grants Scheme committee members who rate their satisfaction with the quality of services provided to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

99%

Achieved

Percentage of complete and eligible applications received before the advertised closing date that are presented to the next decision-making meeting is no less than:

95%

100%

100%

Achieved

Percentage of payments made to grant recipients within 20 working days of receipt of committee approval and correctly completed client documentation is no less than:

95%

99.9%

100%

Achieved

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Crown Funding Schemes, Trusts and Fellowships

Percentage of respondents to a survey of Crown Funding Schemes, Trust and Fellowship grant applicants who rate their satisfaction with the quality of services provided at 3 or above on a scale of 1 to 5 is no less than:

90%

95.5%

94%

Achieved

Percentage of respondents to a survey of Crown Funding Schemes, Trust and Fellowship committee members who rate their satisfaction with the quality of services provided to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

100%

Achieved

Percentage of complete and eligible applications received before the advertised closing date that are presented to the next decision-making meeting is no less than:

95%

100%

100%

Achieved

Percentage of payments made to grant recipients within 20 working days of receipt of committee approval and correctly completed client documentation is no less than:

95%

95%

100%

Achieved

The percentage of completed Crown funded projects that meet funding agreement objectives is no less than:

85%

90%

90%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Lottery Grants

Number of applications received

3,800–4,700

5,714

5,382

Number of grants disbursed

2,500–4,000

4,577

4,592

Community Organisation Grants Scheme

Number of applications received

4,500–6,300

5,112

4,426

Number of grants disbursed

4,200–5,400

4,143

3,604

Crown Funding Schemes, Trusts and Fellowships

Number of applications received

200–300

435

778

Number of grants disbursed

50–70

260

277

Administration and Advisory Services to Committees
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Lottery Grants

Percentage of respondents to a survey of Lottery committee members who rate their satisfaction with the quality of advisory services to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

100%

Achieved

Percentage of respondents to a survey of Lottery committee members who rate their satisfaction with the quality of administration services provided to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

100%

Achieved

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Community Organisation Grants Scheme (COGS)

Percentage of respondents to a survey of COGS committee members who rate their satisfaction with the quality of advisory services to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

98%

Achieved

Percentage of respondents to a survey of COGS committee members who rate their satisfaction with the quality of administration services provided to the committee at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

99%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAL 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,638 Crown 4,496 4,474 4,497
9,872 Third Parties 10,231 10,645 10,446
14,510 Total Revenue 14,727 15,119 14,943
         
14,438 Expenses 14,508 15,117 14,941
72 Net Surplus/(Deficit) 219 2 2

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $176,000 was due to a decrease in the cost of services to the Lottery Grants Board ($128,000) and a decrease in the funding required for the State Sector Retirement Savings Scheme ($81,000), partially offset by a reallocation of shared services costs ($18,000), an increase in the funding required for KiwiSaver ($10,000) and an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($5,000).

VOTE COMMUNITY AND VOLUNTARY SECTOR

Community Advisory Services

Description

This output includes providing advice, information, resources and facilitation services to empower communities/whānau/hapū/iwi, Māori organisations and community groups to develop innovative responses to meet their needs.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Development Assistance to Community Groups

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of respondents to a customer survey who rate their satisfaction with the quality of advice at 3 or above on a scale of 1 to 5 is no less than:

90%

96%

95%

Achieved

Percentage of respondents to a customer survey who rate their satisfaction with the quality of information resources at 3 or above on a scale of 1 to 5 is no less than:

90%

95%

97%

Achieved

Percentage of respondents to a customer survey who rate their satisfaction with the timeliness of advice provided at 3 or above on a scale of 1 to 5 is no less than:

90%

97%

97%

Achieved

Percentage of community development projects that deliver on all services and/or advice, as agreed with managers in the project plan

100%

100%

100%

Achieved

Annual increase in the number of visits to the CommunityNet Aotearoa website

10%

16%

15%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
5,363 Crown 5,244 5,183 5,243
57 Third Parties 88 144 103
5,420 Total Revenue 5,332 5,327 5,346
         
5,123 Expenses 5,308 5,328 5,347
297 Net Surplus/(Deficit) 24 (1) (1)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $19,000 was due to an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($42,000), a reallocation of shared services costs ($18,000) and an increase in the funding required for KiwiSaver ($5,000), partially offset by a decrease in the funding required for the State Sector Retirement Savings Scheme ($46,000).

VOTE COMMUNITY AND VOLUNTARY SECTOR

Policy Advice – Community

Description

This output covers:

  • policy advice with a community/whānau/hapū/iwi development perspective. Policy advice also involves preparing ministerial briefings and speech notes, and providing support for the Minister for the Community and Voluntary Sector, as required, in Cabinet committees, select committees and Parliament
  • policy advice and information on matters relating to the performance of and appointments to the Charities Commission
  • draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister for the Community and Voluntary Sector or referred from other Ministers.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Community Policy Advice

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice will be delivered according to the Output Plan (and any subsequent amendments) as negotiated between the Minister and the Chief Executive

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied
or better*

Very Good

Satisfied

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

95%

100%

96.2%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

100%

100%

Achieved

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

100%

100%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries and answers to parliamentary questions

50–120

61

26

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
1,741 Crown 1,692 1,680 1,691
18 Third Parties 31 31 20
1,759 Total Revenue 1,723 1,711 1,711
         
1,687 Expenses 1,610 1,712 1,712
72 Net Surplus/(Deficit) 113 (1) (1)

Actual expenditure was 6% lower than the Supplementary Estimates mainly due to curtailed interface activities and efficiency gains during the year.

Vote Emergency Management

The funding within Vote Emergency Management helps to ensure that New Zealand communities are safer because the threats and risks to their safety have been minimised and effectively managed.

The Department is particularly responsible for the performance of the Emergency Management Services within this Vote. These include:

  • management of national emergency readiness, response and recovery
  • policy advice – emergency management
  • support services, information and education.

The services provided within these outputs have enabled the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Contribution
Contributes to:

Management of national emergency readiness, response and recovery

  • Leading the national response to civil defence emergencies
  • Enhancing the capability of agencies to respond to emergencies
  • Raising public awareness and understanding of the risks associated with New Zealand hazards

Safer communities

Policy Advice – Emergency Management

Support Services, Information and Education

Vote Emergency Management

Management of National Emergency Readiness, Response and Recovery

Description

This output includes:

  • providing support to local civil defence emergency management organisations
  • maintaining the national crisis management centre in a state of readiness, national training and education
  • coordination and management of central government’s response and recovery activities and administration of related expenses.

Performance information

Monitoring of Emergency Events
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of local authorities/civil defence emergency management (CDEM) Groups, government agencies, lifeline utilities that rate their satisfaction with the quality of information provided for monitoring events and incidents at 3 or above on a scale of 1 to 5, as measured by the annual stakeholder survey, is no less than:

80%

90%

95%

Achieved

Percentage of national warnings issued within 30 minutes after the identification of a pending event is:

100%

40%

75%

Not achieved

National warnings were not all issued within the desired 30 minute standard due to a need for additional capability. Further training has been provided to relevant parties to help meet the performance standard.

Percentage of addressees that successfully receive national warning messages during tests is no less than:

95%

99%

96%

Achieved

Number of National Warning System tests conducted is no fewer than:

4

4

7

Achieved

Provide advice to local authorities/CDEM Groups, government agencies and lifeline utilities of events and incidents that have the potential to lead to civil defence emergency declarations

As required

40

115

Achieved

Management of Emergencies
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Attendance and participation of personnel in NCMC staff development is no less than:

90%

93%

Achieved

Achieved

Percentage of National Crisis Management Centre (NCMC) activations of mode 2 or higher during an emergency event that are reviewed to determine any lessons identified is no less than:

100%

75%

100%

Not achieved

NCMC had four activations of mode 2 or higher. Lessons were identified for each event. However, the lessons from the Vanuatu Tsunami were considered jointly as part of the ongoing review of a similar event, the Samoa Tsunami, which occurred one week earlier.

Percentage of lessons identified from reviews and debriefs of NCMC activations for emergency events are noted and followed up within six months is no less than:

100%

93%

100%

Not achieved

The implementation of action points from one review is still in progress.

Percentage of activations where the NCMC is appropriately staffed according to the mode of activation within 2 hours from a decision to activate is:

100%

100%

100%

Achieved

Coordinate and manage the staffing of the NCMC during extended activations in accordance with the requirements of the Response Concept of Operations:

Achieved

N/A

N/A

There were no extended activations in the 2009/10 year.

Number of NCMC staff development sessions held is no fewer than:

10

12

12

Achieved

Number of equipment checks confirming functionality of all NCMC systems

12

35

22

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,304 Crown 4,348 4,224 4,348
41 Third Parties 47 61 56
4,345 Total Revenue 4,395 4,285 4,404
         
3,985 Expenses 3,875 4,275 4,394
360 Net Surplus/(Deficit) 520 10 10

The increase in the budget between the Main Estimates and the Supplementary Estimates of $119,000 was due to an expense transfer from 2008/09 to 2009/10 for the Ministry of Civil Defence and Emergency Management Information Management Programme ($349,000), a reallocation of capability funding ($42,000) and an increase in the funding required for the State Sector Retirement Savings Scheme ($1,000), partially offset by transfers of funding to Vote Internal Affairs ($200,000) and Vote Local Government ($42,000), a reallocation of shared services costs ($25,000) and a decrease in the funding required for KiwiSaver ($6,000).

Actual expenditure was 12% lower than the Supplementary Estimates mainly due to delays in the implementation of the Information Management Development Programme, for which an in-principle expense transfer from 2009/10 to 2010/11 has been approved (a combined total of up to $1.000 million with the output expense Support Services, Information and Education).

Vote Emergency Management

Policy Advice – Emergency Management

Description

This output covers:

  • policy advice and information on matters relating to civil defence and emergency management. Policy advice also involves preparing ministerial briefings and speech notes, and providing support for the Minister of Civil Defence, as required, in Cabinet committees, select committees and Parliament
  • draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister of Civil Defence or referred from other Ministers.

This work contributes to the development of Safer communities.

Performance information

Emergency Management Policy Advice
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice will be delivered according to the Output Plan (and any subsequent amendments) as negotiated between the Minister and the Chief Executive

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied or better*

Very Good

Very Good

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

100%

100%

Achieved

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

100%

100%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries and answers to parliamentary questions

20–40

173[1]

164

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
961 Crown 860 955 860
20 Third Parties 23 19 20
981 Total Revenue 883 974 880
         
927 Expenses 846 974 880
54 Net Surplus/(Deficit) 37 0 0

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $94,000 was due to a reallocation of capability funding ($95,000), partially offset by an increase in the funding required for KiwiSaver ($1,000).

Vote Emergency Management

Support Services, Information and Education

Description

This output covers:

  • developing and implementing policies and projects that will assist with information services, readiness, and education within the civil defence emergency management (CDEM) sector
  • providing support, monitoring, information, frameworks, guidelines and professional development for the CDEM sector
  • developing and delivering long-term national programmes to raise individual and community awareness and preparedness.

This work contributes to the development of Safer communities.

Performance information

Emergency Sector Support and Development
RESULTS INFORMATION
PERFORMANCE sTANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of CDEM Groups that rank their satisfaction with the level of service provided by regional emergency management advisors at 3 or above on a scale of 1 to 5, as measured by stakeholder surveys is no less than:

80%

93%

95%

Achieved

Percentage of attendees who are satisfied with the education or training interventions attended, as measured by course satisfaction surveys, is no less than:

85%

100%

98%

Achieved

Percentage of stakeholders who receive MCDEM’s newsletters/ updates that rate their satisfaction with the quality of the publications at 3 or above on a scale of 1 to 5, as measured by the stakeholder survey, is no less than:

90%

97%

98.8%

Achieved

Percentage of stakeholders that rank their satisfaction with the quality of guidelines, codes, technical standards developed by MCDEM at 3 or above on a scale of 1 to 5, as measured by stakeholder surveys, is no less than:

80%

98%

New measure

Achieved

Number of CDEM readiness and response exercises participated in and/or evaluated

8

8

7

Achieved

Number of newsletters/updates provided to the CDEM sector

16

17

18

Achieved

Develop or review guidelines, codes, technical standards or other CDEM sector information publications

1–3

2

5

Achieved

Deliver or sponsor education or training interventions in consultation with the emergency management sector and other relevant organisations

6

7

9

Achieved

Community Information
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Mass-media promotional activity is delivered through television, radio, print, and the web in accordance with the Public Education Programme

Achieved

Achieved

Achieved

Achieved

The level of public awareness of the television campaign, as measured by the annual survey, which forms part of the Public Education Programme, is greater than:

50%

68%

62%

Achieved

The ‘What’s the Plan, Stan’ schools programme is delivered through the ongoing development and promotion of the resource in accordance with the national Public Education Programme

Achieved

Achieved

Achieved

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
6,218 Crown 6,142 5,712 6,138
66 Third Parties 79 75 69
6,284 Total Revenue 6,221 5,787 6,207
         
5,621 Expenses 5,458 5,800 6,220
663 Net Surplus/(Deficit) 763 (13) (13)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $420,000 was due to an expense transfer from 2008/09 to 2009/10 for the Ministry of Civil Defence and Emergency Management Information Management Programme ($651,000) and a reallocation of capability funding ($53,000), partially offset by a transfer of funding to Vote Local Government ($258,000), a reallocation of shared services costs ($20,000) and a decrease in the funding required for Kiwisaver ($6,000).

Actual expenditure was 12% lower than the Supplementary Estimates mainly due to delays in the implementation of the Information Management Development Programme, for which an in-principle expense transfer from 2009/10 to 2010/11 has been approved (a combined total of up to $1.000 million with the output expense, Management of National Emergency Readiness, Response and Recovery).

Vote Internal Affairs

The funding within Vote Internal Affairs contributes to a wide range of outcomes for New Zealand people, communities and government.

The services provided through this Vote have enabled the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Impact
Contributes to:

Contestable Services

  • Providing translation and foreign language services to Government and the public

Executive Government is well supported

Government Technology Services

  • Developing and implementing a plan for increased interoperability of ICT systems and services across the State sector
  • Establishing and promulgating standards and architecture for common ICT services
  • Operating as a lead agency to deliver common ICT services to the public and agencies

Common information and communications technology (ICT) services deliver improved State sector performance and better citizen experience

Identity Services

  • Providing reliable and accessible identity services
  • Providing sector leadership in identity information management

New Zealand’s approach to identity is trusted and well led

Strong, sustainable communities/hapū/iwi

Information and Advisory Services

  • Providing neutral advice and impartial secretariat services

Executive Government is well supported

Policy Advice – Internal Affairs

  • Providing leadership and advice on matters relating to gaming, censorship, fire, identity and more

Strong, sustainable communities/hapū/iwi

Safer communities

New Zealand’s approach to identity is trusted and well led

Executive Government is well supported

Regulatory Services

  • Encouraging and enforcing compliance with gambling legislation
  • Encouraging and enforcing compliance with the Films, Videos and Publications Classification Act 1993, and the Unsolicited Electronic Messages Act 2007

Safer communities

Services for Ethnic Affairs

  • Providing advice that supports community development
  • Providing responsive policies and services to diverse communities

Strong, sustainable communities/hapū/iwi

Anti-Money Laundering and Countering Financing of Terrorism

  • Establishment and implementation of a supervisory function under the Anti-Money Laundering and Countering Financing of Terrorism Act 2009

Safer communities

Vote Internal Affairs

Contestable Services

Description

This output covers services including translation and other foreign language services to government agencies, non-government organisations and the public.

Performance information

Translation Services
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of respondents to a customer survey who rate their satisfaction with the quality of translation services at 3 or above on a scale of 1 to 5 is no less than:

99%

100%

100%

Achieved

Percentage of translations meeting timeframes agreed with customers is no less than:

99%

99.11%

99.5%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
0 Crown 0 0 0
870 Third Parties 833 899 908
870 Total Revenue 833 899 908
         
834 Expenses 818 899 908
36 Net Surplus/(Deficit) 15 0 0

The increase in the budget between the Main Estimates and the Supplementary Estimates of $9,000 was due to forecast additional demand for translation services ($34,000) partially offset by reduced activity associated with a decrease in revenue from sub-leased properties ($25,000).

Actual expenditure was 10% lower than the Supplementary Estimates mainly due to a lower level of demand for Translation Services.

Vote Internal Affairs

Government Technology Services – Internal Affairs

Description

This output covers the development, deployment and operation of technology services across the State sector, and includes:

  • the provision of government information and services to the public and State sector agencies using the government’s web presence
  • providing online identity infrastructure
  • overseeing the managed exit of agencies from the Government Shared Network.

Performance information

Internal Affairs – Government Technology Services
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10
ACTUAL
2008/09 ACTUAL
COMMENTS

Web Advisory Services implementations including risk, identity and web 360, delivered to larger agencies, no less than:

10

13

New measure

Achieved

Develop the future service and public access approach and direction for newzealand.govt.nz with input from key stakeholders

Achieved

Achieved

New measure

Achieved

Standardise, rationalise and consolidate State Services employee collaboration tools such as the Public Sector Intranet (PSI) and Shared Workspaces

Achieved

Not achieved

New measure

Not achieved

Additional priorities have impacted the progress of this initiative. Requirements gathering has been completed; however, as DIA is working to replace its web delivery platform, collaboration tools development has been delayed until the platform is available. Delivery is planned in 2010.

Number of logons issued for igovt logon service is no less than:

250,000

52,219

New measure

Not achieved

Delays in integrating external organisations have led to the igovt logon target not being met. The target is anticipated to be met in 2010/11.

Number of agencies connecting to igovt logon service is no less than:

24

16

New measure

Not achieved

A number of agencies are in the process of connecting to the igovt logon service but are not yet formally connected.

igovt Identity Verification Service operating in pilot with Births, Deaths and Marriages

Achieved

Achieved

New measure

Achieved

Network provider selected and Government Shared Network (GSN) transition completed

Achieved

Achieved

New measure

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
0 Crown 11,335 22,845 11,335
0 Third Parties 1,265 1,110 1,180
0 Total Revenue 12,600 23,955 12,515
         
0 Expenses 11,511 23,955 12,515
0 Net Surplus/(Deficit) 1,089 0 0

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $11.440 million was primarily due to the transfer of functions relating to the identity management web infrastructure to the output expense Identity Services ($8.639 million), together with expense transfers from 2009/10 to 2010/11 for the all-of-government authentication programme ($6.000 million) and the all-of-government common information and communication technologies work programme ($0.500 million), partially offset by an expense transfer from 2008/09 to 2009/10 for the Government Shared Network ($3.414 million) and a transfer of funding from Vote Emergency Management for capability building ($0.200 million).

Actual expenditure was 8% lower than the Supplementary Estimates due to slower activity than anticipated on a number of government information services projects and lower expenditure on the Government Shared Network to one.govt transition initiative. An in-principle expense transfer of up to $1.040 million from 2009/10 to 2010/11 was approved for work on the development of the all-of-government common information and communications technology that will continue in 2010/11.

Vote Internal Affairs

Identity Services

Description

This output includes:

  • issuing New Zealand passports
  • processing citizenship applications
  • issuing certificates and providing information and services relating to births, deaths, marriages and civil unions
  • maintaining national records relating to passports, citizenship, births, deaths, marriages and civil unions
  • providing data or data verification to international government agencies, to enhance border security and facilitate travel
  • working across government to develop authentication of identity and to facilitate good practice based on the Evidence of Identity Standard.

This work contributes to the development of the following outcomes:

  • New Zealand’s approach to identity is trusted and well led
  • Strong, sustainable communities/hapū/iwi.

Performance information

Citizenship
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of citizenship documents issued without error is no less than:

99%

99.74%

99.7%

Achieved

Percentage of applications for grant of citizenship recommended to the Minister within four months of receipt of a correctly completed application, for applications received since 1 July 2008, is no less than:

80%

91%

92.5%

Achieved

Percentage of applications for grant of citizenship recommended to the Minister within six months of receipt of a correctly completed application, for applications received prior to 1 July 2008, is no less than:

80%

No longer measured

This measure relates to applications received prior to 1 July 2008. It was split from the measure above in Feb 2009 and removed in Feb 2010.

Percentage of applications for registration of citizenship, not involving adoption, processed within twenty working days of receiving a correctly completed application is no less than:

95%

99.12%

99%

Achieved

Percentage of certificates of citizenship status issued within twenty working days of receipt of a correctly completed application is no less than:

95%

99.54%

99.6%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of applications for grant of citizenship to foreign nationals recommended to the Minister

10,000–14,000

15,623

19,542

Number of registrations of citizenship by descent for New Zealanders born abroad

6,500–8,500

8,552

7,936

Number of certificates of citizenship status issued

2,500–3,500

4,028

3,545

Passports
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of passports, certificates and other identity documents issued without error is no less than:

99%

99.94%

99.9%

Achieved

Percentage of passports issued within 10 working days for standard passports, and three working days for urgent passports, on receipt of a correctly completed application is no less than:

99%

99.40%

99.9%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of passports issued in standard service

378,000– 434,000

396,048

352,246

Number of passports issued in urgent service

35,000–
43,000

36,841

34,659

Number of other travel documents issued

1,000–1,400

1,255

1,173

Births, Deaths, Marriages and Civil Unions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of birth, death, marriage and civil union information registered without error is no less than:

99%

99.58%

99.8%

Achieved

Percentage of birth, death, marriage and civil union certificates issued without error is no less than:

99%

99.68%

99.8%

Achieved

Percentage of deaths registered within three working days of receipt of a correctly completed notification is no less than:

98%

99.97%

99.9%

Achieved

Percentage of births, marriages and civil unions registered within four working days of receipt of a correctly completed notification or application is no less than:

98%

99.98%

99.9%

Achieved

Percentage of certificates from fully computerised registrations issued within one working day of receipt of a correctly completed application is no less than:

99%

99.89%

99.6%

Achieved

Percentage of certificates from partially computerised registrations issued within eight working days of receipt of a correctly completed application is no less than:

98%

99.99%

99.8%

Achieved

Percentage of birth, death, marriage and civil union printouts issued within eight working days of a correctly completed application is no less than:

97%

99.99%

99.5%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 actual

Number of birth registrations

58,000– 64,000

65,387

64,366

Number of death registrations

27,000– 31,000

29,002

29,152

Number of marriage and civil union registrations

22,000– 26,000

23,720

23,883

Number of birth, death, marriage and civil union certificates issued

210,000– 240,000

246,702

253,182

Number of printouts issued

18,000– 25,000

42,053

34,323

Authentication
evidence of identity standard
ESTIMATED VOLUME
2009/10
ACTUAL

Revised Evidence of Identity (EOI) Standard is submitted to the e-GIF Management Committee for consideration in 2009/10 for acceptance as a “Recommended” e-GIF standard

Achieved

  • Engagement is underway with 12 agencies on risk assessments
  • Work programme for 2009/10 was completed, and new work programme for 2010/11 has been drafted.

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
10,012 Crown 16,986 8,359 16,986
74,572 Third Parties 79,801 78,391 77,531
84,584 Total Revenue 96,787 86,750 94,517
         
84,704 Expenses 96,484 92,109 99,876
(120) Net Surplus/(Deficit) 303 (5,359) (5,359)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $7.767 million was primarily due to the transfer of functions relating to the identity management web infrastructure from the output expense Government Technology Services ($8.639 million), together with funding received from the Ministry of Foreign Affairs and Trade as a contribution towards the Vanuatu passport project ($0.172 million), increased demand for Birth, Death and Marriage products ($0.240 million), increased rentals from sub-leased properties ($0.140 million), and increases in the funding required for KiwiSaver ($0.044 million) and the State Sector Retirement Savings Scheme ($0.022 million), partially offset by decreased demand for passport products ($1.055 million) and citizenship products ($0.423 million).

Vote Internal Affairs

Information and Advisory Services

Description

This output covers:

  • publishing the New Zealand Gazette
  • authenticating official documents
  • coordinating the congratulatory message service
  • providing information, advisory and support services to commissions of inquiry and similar bodies, as required.

This work is an administrative service for Government and contributes to the key objective of ensuring Executive Government is well supported.

Performance information

New Zealand Gazette
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Number of complaints where published text is inconsistent with text supplied by client is no more than:

12 per year

4

3.6 (revised measure)

Achieved

Percentage of Principal and Customs editions of The New Zealand Gazette available at retail outlets by the applicable deadline is no less than:

100%

100%

100%

Achieved

Authentications Unit and Congratulatory Message Service
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of Authentications delivered to customers within agreed timeframes is no less than:

98%

99.9%

100%

Achieved

Percentage of congratulatory messages delivered to customers within agreed timeframes is no less than:

98%

100%

99%

(revised measure)

Achieved

Number of Authentication confirmations returned by the customer as inaccurate is, on average, no more than:

12 per year

4

9

(revised measure)

Achieved

Number of congratulatory messages returned by the customer as inaccurate is no more than:

12 per year

3

New measure

Achieved

Commissions of Inquiry and Similar Bodies
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Commissioners’ rating of the timeliness of services provided is 3 or above on a scale of 1 to 5

3 or above

3

5

Achieved

Commissioners’ rating of the quality of services provided is 3 or above on a scale of 1 to 5

3 or above

3

5

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,137 Crown 2,179 1,677 2,179
1,628 Third Parties 1,573 1,335 1,432
5,765 Total Revenue 3,752 3,012 3,611
         
4,444 Expenses 2,816 3,010 3,609
1,321 Net Surplus/(Deficit) 936 2 2

The increase in the budget between the Main Estimates and the Supplementary Estimates of $599,000 was due to an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($312,000), new funding for the Forum for Complainants of Police Misconduct (net $190,000) and for the provision of financial services to the Ministry of Pacific Island Affairs ($90,000), together with an increase in the funding required for the State Sector Retirement Savings Scheme ($7,000).

Actual expenditure was 22% lower than the Supplementary Estimates primarily due to a lower level of uptake of the Listening and Assistance Service.

Vote Internal Affairs

Policy Advice – Internal Affairs

Description

This output covers:

  • policy advice and information on matters relating to:
  • gambling, censorship, unsolicited electronic messages, fire, identity, public inquiries and daylight saving
  • the performance of and appointments to Crown entities
  • appointments to statutory bodies
  • the Significant Community-Based Project Fund.

Policy advice also involves preparing ministerial briefings and speech notes, and providing support for the Minister of Internal Affairs, as required, in Cabinet committees, select committees and Parliament.

  • draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister of Internal Affairs or referred from other Ministers.

This work contributes to the development of the following outcomes:

  • Strong, sustainable communities/hapū/iwi
  • Safer communities
  • New Zealand’s approach to identity is trusted and well led and the key objective of
  • Ensuring Executive Government is well supported.

Performance information

Internal Affairs Policy Advice
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10
ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice will be delivered according to the Output Plan (and any subsequent amendments) as negotiated between the Minister and the Chief Executive

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied or better*

Good – Very Good

Very Good

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

95%

99.9%

99.9%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

99.3%

100%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

92.9%

94.1%

Not achieved

One response out of 14 was late.

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

96.6%

99.6%

Not achieved

Three responses out of 87 were late.

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries and answers to parliamentary questions

550–650

716

864

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
5,146 Crown 4,520 4,208 4,520
53 Third Parties 65 117 149
5,199 Total Revenue 4,585 4,325 4,669
         
4,760 Expenses 4,021 4,324 4,668
439 Net Surplus/(Deficit) 564 1 1

The increase in the budget between the Main Estimates and the Supplementary Estimates of $344,000 was due to an expense transfer from 2008/09 from 2009/10 for sustainable accommodation ($438,000), an increase in the funding required for KiwiSaver ($25,000) and the State Sector Retirement Savings Scheme ($7,000), partially offset by a transfer of funding to the non-departmental other expense Miscellaneous Grants – Internal Affairs for funding for the Nelson Historic Theatre Trust ($84,000), and a reallocation of shared services costs ($42,000).

Actual expenditure was 14% lower than the Supplementary Estimates mainly as a result of vacancies and efficiency gains over the course of the year.

Vote Internal Affairs

Regulatory Services

Description

This output covers:

  • providing operational policy advice on the gambling regulatory regime pursuant to the Gambling Act 2003
  • licensing gambling operators; completing audits, venue inspections and working with the community and stakeholders to best achieve compliance with gambling legislation; responding to possible breaches of gambling legislation; resolving all breaches of gambling legislation; and responding to inquiries from the community and stakeholders on gambling legislation
  • providing enforcement of the Films, Videos, and Publications Classification Act 1993, and advice and information to stakeholders and the public regarding censorship legislation
  • providing enforcement of the Unsolicited Electronic Messages Act 2007 and advice and information to stakeholders and the public regarding unsolicited electronic messages; participating in and complying with international regulatory arrangements to address the problem of unsolicited electronic messages
  • providing services to the Gambling Commission (these functions are carried out entirely separately from the Department’s gambling-related policy and operational functions, to underpin the independence of the Gambling Commission).

This work contributes to the development of Safer communities.

Performance information

Regulatory Services – Gambling
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of audits of club gaming machine societies completed within two months is no less than:

80%

94.6%

New measure

Achieved

Percentage of audits of non-club gaming machine societies completed within three months is no less than:

80%

64.3%

New measure

Not achieved

The complexity of the issues identified during the audit process has led to longer completion times.

Percentage of gambling prosecution cases dismissed where prima facie case is not established is no more than:

5%

0%

0%

Achieved

Percentage of respondents to a survey of gambling sector organisations and operators who rate their satisfaction with how information services provided by the Department support their ability to comply with relevant laws conditions and rules at 3 or above on a scale of 1 to 5 is no less than:

85%

94%

96%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09
ACTUAL

Number of club and non-club licence renewal applications processed

350–400

440

362 (revised measure)

Number of other class 3 and 4 licence applications and Certificates of Approval processed

5,500–6,000

4,292

6,622 (revised measure)

Number of clubs and non-clubs audited

17–40

70

New measure

Number of venue inspections

200–300

292

New measure

Number of possible breaches of gambling legislation identified

As required

208

New measure

Number of breaches found

As required

88

New measure

Gambling Commission
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

The Gambling Commission’s satisfaction with the services provided by the secretariat is 3 or above on a scale of 1 to 5

3 or above

5

5

Achieved

Regulatory Services – Censorship
RESULTS INFORMATION
PERFORMANCE sTANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of non-compliant practices identified during inspection processes or as a result of complaints are dealt with during the inspection or within 3 months, and the balance dealt with within 12 months

75% within
3 months

25% within
12 months

86%

14%

87%

13%

Achieved

Percentage of censorship prosecution cases dismissed where prima facie case is not established is no more than:

5%

0%

0%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of inspections at outlets for publications/videos/films undertaken

1,500

1,980

1,577

Number of censorship complaints and proactive investigations for publications/videos/films and on the Internet responded to

600

902

854

Number of censorship prosecutions undertaken

20–40

39

49

Regulatory Services – Unsolicited Electronic Messages
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of New Zealand-linked complaints, which are dealt with within 3 months of receipt and the balance dealt with within 12 months is no less than:

75% within
3 months

25% within
12 months

77%

23%

34.2%

65.8%

(revised measure)

Achieved

Number of formal presentations to industry and the community

4

15

9

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of New Zealand-linked complaints (including complaints about electronic messages containing unsolicited sexual content) and proactive investigations responded to

700

827

637

Number of public enquiries responded to

300

2,129

New measure

Number of civil liability proceedings undertaken

As required

5

New measure

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
3,198 Crown 3,639 3,639 3,639
23,210 Third Parties 22,808 23,737 23,733
26,408 Total Revenue 26,447 27,376 27,372
         
25,166 Expenses 24,910 25,929 25,925
1,242 Net Surplus/(Deficit) 1,537 1,447 1,447

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $4,000 was due to a reduction in the funding required for KiwiSaver.

Vote Internal Affairs

Services for Ethnic Affairs

Description

This output covers policy advice and information on matters relating to ethnic affairs, including:

  • preparing ministerial briefings and speech notes, and providing support for the Minister for Ethnic Affairs, as required, in Cabinet committees, select committees and Parliament
  • providing draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister for Ethnic Affairs or referred from other Ministers
  • providing advisory and information services to ethnic communities, and information to the public to raise the level of knowledge about ethnic communities and their contribution to New Zealand
  • providing advice on ethnic perspectives to other agencies through participating in cross-government initiatives and providing secondary policy advice
  • managing the contract for the telephone interpreting service (Language Line)
  • providing information and training to ethnic communities and government agencies on using Language Line.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Ethnic Affairs Policy Advice
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice is delivered according to the Output Plan (and any subsequent amendments) as negotiated between the Minister and the Chief Executive

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied or better*

Good

Good

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

100%

N/A

Achieved

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

100%

100%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries, and answers to parliamentary questions

40

29

32

Advisory and Information Services to Ethnic Communities
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of key stakeholders who rate the quality and effectiveness of the advisory services provided to ethnic communities at 3 or above on a scale of 1 to 5, as measured by stakeholder surveys is no less than:

85%

98%

92%

Achieved

Percentage of Language Line Services (calls) that are a subject of a complaint is no more than:

0.5%

0.1%

0

Achieved

Percentage of requests for written advice answered within 10 working days or according to the timeframes agreed with the correspondent is no less than:

95%

99.6%

99%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of requests from ethnic communities for information or advice responded to

3,500–4,000

9,373[2]

8,801

Number of ethnic communities and government agencies provided with information and training on the use of Language Line

50

94

148

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,742 Crown 4,718 4,557 4,718
1,021 Third Parties 949 962 1,197
5,763 Total Revenue 5,667 5,519 5,915
         
5,670 Expenses 5,651 5,520 5,916
93 Net Surplus/(Deficit) 16 (1) (1)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $396,000 was due to additional demand for Language Line ($245,000), a reallocation of shared services costs ($151,000), an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($10,000), together with an increase in the funding required for the State Sector Retirement Savings Scheme ($2,000), partially offset by a decrease in the funding required for KiwiSaver ($12,000).

Vote Internal Affairs

Anti-Money Laundering and Countering Financing of Terrorism

Description

This output covers the establishment and implementation of a supervisory function under the Anti-Money Laundering and Countering Financing of Terrorism Act 2009.

This work contributes to the development of Safer communities.

Performance information

Activity for the 2009/10 financial year consisted of developing and setting up the function. The supervisory outputs will not commence until a date yet to be set by Order in Council (October 2011 at the earliest). Performance measures will be developed in the lead-up to full implementation.

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
0 Crown 967 0 967
0 Third Parties 2 0 0
0 Total Revenue 969 0 967
         
0 Expenses 353 0 967
0 Net Surplus/(Deficit) 616 0 0

This appropriation was created in 2009/10 to fund the supervisory functions carried out in respect of reporting entities for which the Department is the relevant supervisor under the Anti-Money Laundering and Countering Financing of Terrorism Act.

Actual expenditure was 63% lower than the Supplementary Estimates due to delays in the establishment of the Anti-Money Laundering and Countering Financing of Terrorism unit, and for which an in-principle expense transfer from 2009/10 to 2010/11 of up to $500,000 was approved.

Vote Local Government

The funding within Vote Local Government enabled the Department to administer a system of local government which optimises economic, social and cultural benefits to key stakeholders.

The services provided through this funding has enabled the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Impact
Contributes to:

Implementation of Auckland Governance Reforms

  • Providing advice and information on the system of local government
  • Promoting effective relationships between local government and communities

Strong, sustainable communities

Information, Support and Regulatory Services

Policy Advice – Local Government

Vote Local Government

Implementation of Auckland Governance Reforms

Description

This output covers the implementation of the Government’s decisions on the recommendations of the Royal Commission on Auckland Governance.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Local Government Commission Advice and Support
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

An Establishment Board and transition agency to manage the transition to new local governance arrangements in Auckland will be established according to the provisions in legislation

Achieved

Achieved

New measure

Achieved

A plan and budget for the management of the transition will be developed, within the agreed timeframe, after the legislation is in place

Achieved

Achieved

New measure

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
1,275 Crown 0 9,144 0
1 Third Parties 464 0 566
1,276 Total Revenue 464 9,144 566
         
232 Expenses 379 9,144 566
1,044 Net Surplus/(Deficit) 85 0 0

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $8.578 million reflects a transfer to the non-departmental capital appropriation, Loan to the Auckland Transition Agency ($10.187 million), partially offset by an expense transfer from 2008/09 to 2009/10 for the establishment of the Auckland Transition Agency ($1.043 million) and an increase in funding for the provision of financial and information technology services to the Auckland Transition Agency ($0.566 million).

Actual expenditure was 33% lower than the Supplementary Estimates mainly reflecting lower demand for the provision of financial and information and technology services to the Auckland Transition Agency.

Vote Local Government

Information, Support and Regulatory Services – Local Government

Description

This output covers:

  • providing advisory and support services to the Local Government Commission in respect of its statutory functions
  • providing information to and about local government
  • administering the Local Government Act 2002, Local Electoral Act 2001 and other statutes
  • administering the Rates Rebate Scheme
  • providing regulatory and boating services for Lake Taupo
  • governance and management of the National Dog Control Information Database and education about dogs
  • providing operational advice and support to the Minister of Local Government.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Local Government Commission Advice and Support
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Local Government Commission’s satisfaction with the quality of advice and support services provided rated at 3 or above on a scale of 1 to 5 is no less than:

3 or above

4

4

Achieved

Percentage of Local Government Commission decisions dispatched to parties within 10 working days of decision, or to such other timetable as instructed by the Commission is:

100%

100%

100%

Achieved

Local Government Services
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of rates rebate claims processed accurately is no less than:

99%

99%

100%

Achieved

Percentage of requests for information from the public about the Rates Rebate Scheme responded to within 15 working days is no less than:

99%

98%

100%

Not achieved

A lack of resource in the month of June led to measure not being achieved.

Percentage of claims for rates rebates processed within 20 working days is no less than:

98%

98%

99.99%

Achieved

Percentage of system availability for the National Dog Database is no less than:

99%

99%

99.99%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of responses to requests for information from the public about the Rates Rebate Scheme

300–600

473

444

Number of rates rebate claims received for processing

100,000– 140,000

109,695

109,905

Regulatory and Boating Services for Lake Taupo
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

The Taupo Harbourmaster will implement a programme of facilities inspection and maintenance

Facilities managed in accordance with programme and standards

Achieved

Achieved

Achieved

All boating facilities on Lake Taupo are maintained to an appropriate level of safety and usability

Facilities maintained to specified standards

Achieved

Achieved

Achieved

Percentage of respondents to a survey of key stakeholders who rate their satisfaction with the quality of Lake Taupo regulatory services at 3 or above on a scale of 1–5 is no less than:

85%

100%

100%

Achieved

Percentage of prosecutions taken under navigation safety legislation and regulations dismissed because a prima facie case has not been established is no more than:

10%

0%

0%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,852 Crown 3,277 3,137 3,277
663 Third Parties 682 900 818
5,515 Total Revenue 3,959 4,037 4,095
         
5,080 Expenses 4,067 4,057 4,115
435 Net Surplus/(Deficit) (108) (20) (20)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $58,000 reflects a transfer of funding from Vote Emergency Management for capability building ($300,000), together with an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($55,000), a reallocation of shared services costs ($13,000), and an increase in the funding required for Kiwisaver ($4,000), partially offset by a transfer of funding to Policy Advice – Local Government for the monitoring of the Auckland Transition Agency ($228,000), a decrease in levies required from territorial authorities for the management of the National Dog Database ($50,000) and a decrease in the funding required for the State Sector Retirement Savings Scheme ($36,000).

Vote Local Government

Policy Advice – Local Government

Description

This output covers:

  • policy advice and information on local government issues. It also involves monitoring the local government system, preparing ministerial briefings and speech notes, and providing support for the Minister of Local Government, as required, in Cabinet committees, select committees and Parliament
  • draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister of Local Government or referred from other Ministers.

This work contributes to the development of Strong, sustainable communities/hapū/iwi.

Performance information

Local Government Policy Advice
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice will be delivered according to the Output Plan (and any subsequent amendments) as negotiated between the Minister and the Chief Executive

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied or better*

Very Good

Very Good

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

90%

100%

99.9%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

100%

99.9%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

100%

N/A

Achieved

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

100%

100%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries and answers to parliamentary questions

3,000–3,500

1,877[3]

1,807

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
7,109 Crown 7,358 7,072 7,360
219 Third Parties 86 94 66
7,328 Total Revenue 7,444 7,166 7,426
         
7,741 Expenses 7,258 7,167 7,427
(413) Net Surplus/(Deficit) 186 (1) (1)

The increase in the budget between the Main Estimates and the Supplementary Estimates of $260,000 was due to a transfer of funding from Information, Support and Regulatory Services – Local Government for the monitoring of the Auckland Transition Agency ($228,000), a reallocation of shared services costs ($53,000), an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($7,000), and an increase in the funding required for KiwiSaver ($4,000), partially offset by a decrease in the funding required for the State Sector Retirement Savings Scheme ($32,000).

Vote Ministerial Services

The funding within Vote Ministerial Services is used to provide advice and services that ensure the Executive Government is well supported. This includes:

  • Support Services to Ministers
  • VIP Transport
  • Visits and Official Events Coordination.

The services provided through this funding have enabled the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Impact
Contributes to:

Support Services to Ministers

  • Ensuring that a range of services and processes needed to be effective is available to the Executive, both inside and outside Parliament

Executive Government is well supported

VIP Transport

Visits and Official Events Coordination

Vote Ministerial Services

Support Services to Ministers

Description

This output covers:

  • providing a range of support services for Members of the Executive, including office administration, accounting, personnel, information and communications technology, facilities management, media and other advisory services
  • providing and managing residential accommodation for Members of the Executive, both owned and leased property.

This work contributes to ensuring Executive Government is well supported.

Performance information

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of Members of the Executive responding to the annual satisfaction survey who assess the quality of support services provided at 3 or above on a scale of 1 to 5 is no less than:

90%

95%

95.5%

Achieved

Percentage of Members of the Executive responding to the annual satisfaction survey who assess their satisfaction with the timeliness of services provided to them at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

95.5%

Achieved

The Minister Responsible for Ministerial Services is requested to indicate his/her satisfaction with the level of administration of support services provided to the Executive

Satisfied or better*

Very Good

Very Good

Achieved

The Minister Responsible for Ministerial Services is requested to indicate his/her satisfaction with the quality of operational advice

Satisfied or better*

Very Good

Very Good

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
29,943 Crown 26,710 27,686 26,713
1,241 Third Parties 448 483 399
31,184 Total Revenue 27,158 28,169 27,112
         
30,154 Expenses 26,758 28,168 27,111
1,030 Net Surplus/(Deficit) 400 1 1

The decrease in the budget between the Main Estimates and the Supplementary Estimates of $1.057 million was due to transfers of funding to the non-departmental other expense Members of the Executive’s Internal and External Travel ($350,000) and the departmental output expense Visits and Official Events Coordination ($300,000), a reclassification of the ministerial accommodation payments as a non-departmental expense ($200,000), a reallocation of shared services costs ($149,000), and a decrease in the funding required for the State Sector Retirement Savings Scheme ($97,000), partially offset by an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($26,000), and an increase in the funding required for KiwiSaver ($13,000).

Vote Ministerial Services

VIP Transport

Description

This output covers the provision of:

  • chauffeur-driven vehicle services for Members of the Executive, the Leader of the Opposition, the Speaker, former Prime Ministers and their spouses, former Governors-General and their spouses, the judiciary and distinguished visitors
  • self-drive vehicles for Members of the Executive.

This work contributes to ensuring Executive Government is well supported.

Performance information

RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of Members of the Executive who rate their satisfaction with the transport services provided to them at 3 or above on a scale of 1 to 5 is no less than:

90%

100%

100%

Achieved

Percentage of replacement vehicles complying with European Fuel Emission Standard IV is no less than:

90%

100%

100%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
0 Revenue Crown 0 0
7,661 Revenue Third Parties 7,242 7,921 7,921
7,661 Total Revenue 7,242 7,921 7,921
         
7,653 Expenses 7,178 7,921 7,921
8 Net Surplus/(Deficit) 64 0 0

Actual expenditure was 9% lower than the Supplementary Estimates mainly reflecting improved business practice and fleet performance, together with some reduction in the demand for the services.

Vote Ministerial Services

Visits and Official Events Coordination

Description

This output covers services supporting:

  • visits by guests of government
  • receptions at international airports for the Governor-General, Members of the Executive and guests of government
  • State and ministerial functions
  • commemorative events
  • national anniversaries.

This work contributes to ensuring Executive Government is well supported.

Performance information

Coordination of Visits
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of visit programme content and logistics arranged to reflect visit objectives is:

100%

100%

100%

Achieved

Percentage of Ministers who rate their satisfaction with the quality of arrangements for ministerial and State functions at 3 or above on a scale of 1 to 5 is no less than:

(Only Ministers sponsoring ministerial and State functions are surveyed)

90%

100%

100%

Achieved

Coordination of Official Events
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of Members of the Executive who rate their satisfaction with the coordination and management of official events at 3 or above on a scale of 1 to 5 is no less than:

(Only Ministers with responsibility for hosting events are surveyed)

90%

100%

100%

Achieved

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
4,444 Crown 4,698 4,412 4,698
30 Third Parties 36 25 38
4,474 Total Revenue 4,734 4,437 4,736
         
3,912 Expenses 4,472 4,437 4,736
562 Net Surplus/(Deficit) 262 0 0

The increase in the budget between the Main Estimates and the Supplementary Estimates of $299,000 was due to a transfer of funding from the departmental output expense Support Services to Ministers ($300,000), an increase in the funding required for the State Sector Retirement Savings Scheme ($13,000), and an expense transfer from 2008/09 to 2009/10 for sustainable accommodation ($10,000), partially offset by a reallocation of shared services costs ($24,000).

Actual expenditure was 6% lower than the Supplementary Estimates reflecting the cancellation or postponement of a number of scheduled guests of government visits.

Vote Racing

The funding within Vote Racing contributes to the ongoing integrity and community benefit of racing. This includes providing policy advice on matters relating to racing, sports betting, and the racing industry generally, as well as support to the Minister for Racing, as required.

The services provided within Vote Racing enable the Department to contribute to its outcomes as described in Part Two (Outcome Contribution) and below.

Output
Impact
Contributes to:

Policy Advice – Racing

  • Provide policy advice to help ensure the ongoing integrity and community benefit of racing

Safer communities

Vote Racing

Policy Advice – Racing

Description

This output covers:

  • policy advice and information on matters relating to racing and sports betting and on the racing industry generally. Policy advice also involves preparing ministerial briefings and speech notes, and providing support for the Minister for Racing, as required, in Cabinet committees, select committees and Parliament, and administration of Crown funding in relation to racing
  • draft replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions addressed to the Minister for Racing or referred from other Ministers.

This work contributes to the development of Safer communities.

Performance information

Racing Policy Advice
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Policy advice is delivered according to the policy work programme (and any subsequent amendments) as negotiated between the Minister for Racing and the Chief Executive.

The policy programme is set out below:

  • Administering the Racing Safety Development Fund and the Racing Promotion and Sponsorship Scheme
  • Reviewing the Racing Safety Development Fund
  • Providing ad hoc advice on racing
  • Responding to other portfolio initiatives

100%

100%

100%

Achieved

Policy advice is delivered in accordance with agreed policy quality criteria as listed here

100%

100%

100%

Achieved

The Minister is requested to indicate his/her level of satisfaction with the quality of policy advice

Satisfied or better*

Very Good

Very Good

Achieved

Policy advice is delivered according to the timeframes agreed

100%

100%

100%

Achieved

(* Ratings used in all Ministerial Satisfaction Surveys are – Very Good, Good, Satisfied, Poor or Very Poor)

Ministerial Correspondence and Questions
RESULTS INFORMATION
PERFORMANCE STANDARD
2009/10 ACTUAL
2008/09 ACTUAL
COMMENTS

Percentage of first versions of replies to ministerial correspondence, Official Information Act 1982 requests, Ombudsman’s inquiries and parliamentary questions accepted by the Minister is no less than:

95%

100%

100%

Achieved

Percentage of draft responses to ministerial correspondence returned to the Minister’s office for signature within 15 working days of receipt from the Minister’s office or such other deadlines as may be specifically agreed is no less than:

95%

97.4%

100%

Achieved

Percentage of draft responses to Official Information Act 1982 requests and Ombudsman’s inquiries returned to the Minister’s office for signature five days prior to the statutory deadline for reply is no less than:

100%

100%

100%

Achieved

Percentage of draft replies to parliamentary questions completed within the time frames specified by the Minister is no less than:

100%

100%

100%

Achieved

ACTIVITY INFORMATION
ESTIMATED VOLUME
2009/10 ACTUAL
2008/09 ACTUAL

Number of replies to ministerial correspondence, Official Information Act 1982 requests and Ombudsman’s inquiries, and answers to parliamentary questions

30–50

55

59

Revenue and output expenses

ACTUAL 2008/09 $000
ACTUAl 2009/10
$000
MAIN ESTIMATES 2009/10
$000
SUPPLEMENTARY ESTIMATES 2009/10
$000
  Revenue      
265 Crown 357 356 357
3 Third Parties 6 5 4
268 Total Revenue 363 361 361
         
195 Expenses 246 362 362
73 Net Surplus/(Deficit) 117 (1) (1)

Actual expenditure was 32% lower than the Supplementary Estimates reflecting efficiency gains during the year.

Policy Advice Quality Criteria

In fulfilling the aim to produce policy advice that meets the needs of Ministers, the Department requires that, to the extent to which time and cost-effectiveness considerations permit, policy advice produced within Vote Community and Voluntary Sector, Vote Emergency Management, Vote Internal Affairs, Vote Local Government, Vote Ministerial Services, and Vote Racing meets the following quality criteria:

Purpose
Policy papers should be short (where practicable), succinct and clearly focused on decisions required from Ministers.
Consistency
The advice takes account of other Government policies and decisions, and is consistent with the principles of the Treaty of Waitangi.
Logic
The assumptions behind the advice are explicit and argument is logical and supported by the facts.
Accuracy
The facts in the papers are legally and statistically accurate and all material facts and sources are included. Where appropriate, the advice includes sound legal opinion.
Options
An appropriate range of options is presented; each option is assessed in terms of the benefits and costs for the Government, the economy, the community sector and all other relevant parties. The information provided has sufficient range and depth.
Consultation
There is evidence of adequate consultation with other government agencies and other affected parties and possible objections to proposals are identified.
Practicality
The problems of implementation, technical feasibility, timing and consistency with other policies have been considered. Where appropriate, the advice considers the impact on the lives of New Zealanders.
Presentation
The length and format of Cabinet papers meet ministerial and Cabinet Office requirements. All papers and briefings are in accordance with the Department’s Policy Quality Assurance guidelines. All presentations to Ministers are in accordance with ministerial preference for style and format. All key facts and recommendations are on the first page. All material is effectively, concisely and clearly presented, has short sentences in plain English, and is free of grammatical or numerical errors.
Impartiality
The Department of Internal Affairs strives to provide professional, impartial and comprehensive advice to Ministers and to alert Ministers to the possible consequences of following particular policies, whether or not such advice accords with the Ministers’ views.
  • [1] There were three tsunami alerts in 2009/10, which led to a considerable increase in ministerial correspondence.
  • [2] Increased awareness of the work of the Office of Ethnic Affairs, the Minister’s active engagement with ethnic communities, and the downturn in the economy led to an increase in the number of requests received from ethnic communities.
  • [3] An increased number of ministerials was anticipated in relation to various local government portfolio initiatives. The actual volume was lower than expected.